{"id":5250,"date":"2017-07-15T20:24:55","date_gmt":"2017-07-15T18:24:55","guid":{"rendered":"https:\/\/demo.pinanson.eu\/glossary\/cabling-acronyms\/"},"modified":"2018-09-18T11:45:38","modified_gmt":"2018-09-18T09:45:38","slug":"cabling-acronyms","status":"publish","type":"glossary","link":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/","title":{"rendered":"CABLING ACRONYMS"},"content":{"rendered":"<p>FR:<\/p>\n<p>According to its fire behavior may appear different acronym:<\/p>\n<p>&#8211; FLAME RETARDANT. To the following standards referred:<\/p>\n<p>EN 60332-1: Tests on electric and optical fibre cables under fire conditions. Tests for vertical flame propagation for a single insulated wire or cable. IEC 60332-1 also.<\/p>\n<p>EN 60332-2: Tests on electric and optical fibre cables under fire conditions &#8212; Part 2-1: Test for vertical flame propagation for a single small insulated wire or cable. IEC 60332-2 also.<\/p>\n<p>&#8211; FIRE RETARDANT. To the following standards referred:<\/p>\n<p>EN 60332-3: Tests on electric and optical fibre cables under fire conditions. Test for vertical flame spread of vertically-mounted bunched wires or cables. IEC 60332-3 also.<\/p>\n<p>There are different categories: A, B, C, D.<\/p>\n<p>&#8211; FIRE RESISTIVE. To the following standards referred:<\/p>\n<p>IEC 60331: Tests for electric cables under fire conditions. Circuit integrity.<\/p>\n<p>The difference between Retardant and Resistive is that Retardant one resists the spread of fire into a new area and Resistive one maintain the circuit integrity and can continue to work (under specific conditions) for a time.<\/p>\n<p>LSOH or LSZH:<\/p>\n<p>These initials indicate LOW SMOKE + O (Zero) HALOGENS:<\/p>\n<p>&#8211; LOW SMOKE. To the following standards referred:<\/p>\n<p>EN 61034: Measurement of smoke density of cables burning under defined conditions. IEC 61034 also.<\/p>\n<p>So Low Smoke means low opacity of smoke emitted.<\/p>\n<p>&#8211; O (Zero) HALOGEN. To the following standards referred:<\/p>\n<p>EN 50267: Common test methods for cables under fire conditions. Test on gases evolved during combustion of materials from cables. Determination of the amount of halogen acid gas. IEC 60754 also.<\/p>\n<p>So Zero Halogens mean no acid gases emitted by the combustion.<\/p>\n<p>RoHS:<\/p>\n<p>Restriction of the use of certain Hazardous Substances (Directive 2011\/65\/EU): It Is a directive of the European Parliament and of the Council of 8 June 2011 on the restriction of the use of certain hazardous substances in electrical and electronic equipment (before Directive 2002\/95\/EC).<\/p>\n<p>So when a cable has passed the RoHS restrictions is that the cable does not contain any of the hazardous substances on the directive document list.<\/p>\n<p>Bibliography:<\/p>\n<p>www.aenor.es<\/p>\n<p>www.webstore.iec.ch<\/p>\n<p>www.ec.europa.eu<\/p>\n","protected":false},"excerpt":{"rendered":"<p>  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"glossary-categories":[],"glossary-tags":[],"class_list":["post-5250","glossary","type-glossary","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CABLING ACRONYMS - Pinanson<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CABLING ACRONYMS - Pinanson\" \/>\n<meta property=\"og:description\" content=\"[...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/\" \/>\n<meta property=\"og:site_name\" content=\"Pinanson\" \/>\n<meta property=\"article:modified_time\" content=\"2018-09-18T09:45:38+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/\",\"url\":\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/\",\"name\":\"CABLING ACRONYMS - Pinanson\",\"isPartOf\":{\"@id\":\"https:\/\/pinanson.eu\/#website\"},\"datePublished\":\"2017-07-15T18:24:55+00:00\",\"dateModified\":\"2018-09-18T09:45:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pinanson.eu\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CABLING ACRONYMS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pinanson.eu\/#website\",\"url\":\"https:\/\/pinanson.eu\/\",\"name\":\"Pinanson\",\"description\":\"Connectivity Solutions\",\"publisher\":{\"@id\":\"https:\/\/pinanson.eu\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pinanson.eu\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pinanson.eu\/#organization\",\"name\":\"Pinanson\",\"url\":\"https:\/\/pinanson.eu\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pinanson.eu\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pinanson.eu\/wp-content\/uploads\/2017\/07\/LOGO_PINANSON_H60_Slogan_ES.png\",\"contentUrl\":\"https:\/\/pinanson.eu\/wp-content\/uploads\/2017\/07\/LOGO_PINANSON_H60_Slogan_ES.png\",\"width\":303,\"height\":60,\"caption\":\"Pinanson\"},\"image\":{\"@id\":\"https:\/\/pinanson.eu\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/linkedin.com\/Pinanson\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CABLING ACRONYMS - Pinanson","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/","og_locale":"en_US","og_type":"article","og_title":"CABLING ACRONYMS - Pinanson","og_description":"[...]","og_url":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/","og_site_name":"Pinanson","article_modified_time":"2018-09-18T09:45:38+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/","url":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/","name":"CABLING ACRONYMS - Pinanson","isPartOf":{"@id":"https:\/\/pinanson.eu\/#website"},"datePublished":"2017-07-15T18:24:55+00:00","dateModified":"2018-09-18T09:45:38+00:00","breadcrumb":{"@id":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/pinanson.eu\/en\/glossary\/cabling-acronyms\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pinanson.eu\/"},{"@type":"ListItem","position":2,"name":"CABLING ACRONYMS"}]},{"@type":"WebSite","@id":"https:\/\/pinanson.eu\/#website","url":"https:\/\/pinanson.eu\/","name":"Pinanson","description":"Connectivity Solutions","publisher":{"@id":"https:\/\/pinanson.eu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pinanson.eu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pinanson.eu\/#organization","name":"Pinanson","url":"https:\/\/pinanson.eu\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pinanson.eu\/#\/schema\/logo\/image\/","url":"https:\/\/pinanson.eu\/wp-content\/uploads\/2017\/07\/LOGO_PINANSON_H60_Slogan_ES.png","contentUrl":"https:\/\/pinanson.eu\/wp-content\/uploads\/2017\/07\/LOGO_PINANSON_H60_Slogan_ES.png","width":303,"height":60,"caption":"Pinanson"},"image":{"@id":"https:\/\/pinanson.eu\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/linkedin.com\/Pinanson\/"]}]}},"_links":{"self":[{"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/glossary\/5250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/glossary\/5250\/revisions"}],"wp:attachment":[{"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/media?parent=5250"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/glossary-categories?post=5250"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/pinanson.eu\/en\/wp-json\/wp\/v2\/glossary-tags?post=5250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}