Project photo: London 2012 Olympic Games | Broadcast Centre

Case study · Broadcast

London 2012 Olympic Games | Broadcast Centre

More than 200 Pinanson patch panels were used at the Broadcast Centre of the London 2012 Olympic Games, providing 9,200 3G-SDI video connection points.

Event
London 2012 Olympic Games
Space
Broadcast Centre
Sector
Broadcast

The event

9,200 3G-SDI video connection points

More than 200 Pinanson patch panels were used at the Broadcast Centre during the London 2012 Olympic Games.

Together they provided 9,200 3G-SDI video connection points.

200+Pinanson patch panels
9,2003G-SDI video connection points
2 × 24connectors per panel, on most
75 Ωtrue BNC impedance

The patch panels

BNC patch panels for 3G-SDI video

The patch panels were specifically designed for patching 3G-SDI and earlier video signals.

Like all Pinanson patch panels, they are made of extruded, painted aluminium, with polyester labelling and a calibrated steel cable-support bar.

Format
Mostly 2 rows of 24 connectors
Connectors
Female-to-female BNC feed-through (barrel) connectors with a true 75 Ω impedance
Standard
Compliant with SMPTE 424M and earlier
Insulation
Connector isolated from the chassis with PTFE (Teflon)

Custom Solutions. Unlimited Possibilities.

As with all of our projects, these patch panels were specifically designed for the signals they had to carry: 3G-SDI and earlier video.

If you need a signal distribution infrastructure that does not yet exist on the market, we can design, manufacture and ship it anywhere in the world.